2014-05-02
Information on Compatibility and Connectivity with AMR System of Upper Level
In line with sub-paragraphs “a” and “b” of paragraph 4 of Article 11 of the Order No.77 of “Electricity (Capacity) Market Rules” approved by the Ministry of Energy of Georgia on 30 August of 2006, the following information has been published:
a) List of meters confirmed compatible with AMR System of Upper Level, with indication of type/modification of the meters; In order to be familiar with the published information, please follow this link.
b) Data on connectivity of wholesale metering knots of the Qualified Enterprises with the AMR System of Upper Level, which includes information on summary quantity of metering knots of the Qualified Enterprises, quantity of connected, compatible and not compatible metering knots with the AMR System of Upper Level, also information on the parties liable for establishment of connection in line with requirements of sub-paragraphs “a” and “b” of the Article 411 of the “Electricity (Capacity) Market Rules; In order to be familiar with the published information, please follow this link.
We call Qualified Enterprises up on timely familiarization with the above stated information and plan actions for establishment of connection of the relevant metering points with the AMR System of Upper Level.
The information published will be updated in line with actual progress of the Qualified Enterprises, in permanent mode.
“Georgian State Electrosystem” JSC (GSE) is ready to render relevant consultation to the Qualified Enterprises, the Seekers (Applicants for Connection to Power Network) and other interested parties as needed.
Please, contact employee of GSE – David Dgebuadze (City Line: +995 0322510397; Cell Phone: +995577 1 40 28; E-mail: david.dgebuadze@gse.com.ge) for consultation on the issues related to connection of the metering knots of the Qualified Enterprises with the AMR System of Upper Level, also on the issues related to obtaining/issuing the Technical Document on Confirmation of Connection of the Metering Knots of the Qualified Enterprises and the Seekers (Applicants for Connection to Power Network) with the AMR System of Upper Level.