News

2014-05-20 

Information on form and approval on issuing rules of technical document on confirmation of connection of electricity metering knots with AMR System of Upper Level (For the cases other than a Seeker)

In line with the order No.124 of GSE and considering requirements stated in Article 321 of the “Electricity (Capacity) Market Rules” approved by the Ministry of Energy of Georgia on August 30 of 2006, please find for your consideration the attached form and rule of issuing of the technical document on confirmation of connection of electricity metering knots with AMR System of Upper Level (for the cases other than a Seeker); please see this attachment; E-versions of the draft request letter and to be filled up information form by the Qualified Entity are also attached; Please see Draft Letter and Fillup Form.

The contact persons with Qualified Entities and other interested parties on behalf of GSE for the issues of request and issuing of the technical documents of connection of metering knots with AMR System of Upper Level, also for connection of metering knots with the AMR System of Upper Level are the following persons:

David Dgebuadze (Cell phone: +995-577-10-40-28; City line: +995-0-322-510-397; david.dgebuadze@gse.com.ge);

Diana Makharoblidze (Cell phone: +995-577-102-156; City line: +995-0-322-510-305; diana.makharoblidze@gse.com.ge).