2016-12-30
Main requirements for programming/configuration of meters
Under Article 67(6) of the Network Code approved by Resolution No 10 of 17 April 2014 of the Georgian National Energy and Water Supply Regulatory Commission (hereinafter the Commission) and to ensure fulfillment of the obligations specified in Decision No 38/3 of 16 July 2015 of the Commission, JSC Georgian State Electrosystem, as a dispatch licensee, has developed the main requirements for programming/configuration of electricity meters confirmed to be compatible with upper level AMR system and available at metering points participating in electricity wholesale trade.
Please see Order No 820 of 30 December 2016 and its appendices (Main Requirements for Programming/Configuration of Meters) for individual types of meters:
- A2 type of meter
- A3 type of meter
- A1140 type of meter
- A1800 type of meter
- EA type of meter
- EPQS type of meter
- SL7000 type of meter
- Mercury 230 type of meter
- ПСЧ4 type of meter
Basic Requirements for Programming/Configuration of Energy Meters (Changes to Order No 820 of 30.12.2016 of GSE)
Under Order No 267 of 12.04.2018 of GSE, changes have been made to Order No 820 of 30.12.2016 of GSE on the Approval of Programming/Configuration of Energy Meters, namely, basic requirements for programming/configuration of two types of meters have been added to the basic requirements for programming/configuration of meters approved by Order No 820 of 30.12.2016.
Please see Order No 267 of 12.04.2018 and its Annexes: